Answer :

PART A

Cutting in one minute = 105 ÷ 3 = 35 cuts

Now for six machine = 35 × 6 = 210 parts.

So, the option C. 210 parts is correct answer.

PART B

As, 20 × 3 = 60 seconds

Parts can be stamped in one minute = 24 × 3 = 72

So, time required [tex] = \frac{4320}{72} \\ = 60 \: minutes[/tex]

So, the option D. 60 minutes is c correct answer